EDP-LWRP System

In order for our client to install and work over their new/novel subsea vertical tree system, an ISO13628-7 compliant intervention package was required. Initially, EC-OG completed a concept study which outlined the configuration of the equipment utilising both clients and industry available components, inclusive of detailed risk and technology gap assessments. Following client tollgate sanction, EC-OG progressed the project through detailed design in readiness for manufacture.